ADU Builders in
Long Beach, CA

Compare ADU builders and state-law-driven permit options for Long Beach

Need help choosing a builder?

Tell us about your project and we'll match you with builders that fit your budget + timeline.

Free • No obligation • Reviewed manually

Quick Stats

Max ADU size
800-1,200 sqft
Height
zone-dependent
Setbacks
4 ft typical
Permit Time
1-4 months
Build Cost
$115k-420k
Monthly Rent
$2,100-3,900
ROI
7-12%/year

Directory

4 Builders

Homeplex

Long Beach
(424) 428-8000 homeplex.net

Local proof: Homeplex is based at 145 W Broadway in Long Beach and sells prefab ADUs.

John Christopher Construction

Long Beach • Orange County

Local proof: John Christopher runs a Long Beach-specific ADU builder page.

GatherADU

Long Beach • Los Angeles County
(323) 591-3717 gatheradu.com

Local proof: GatherADU publishes Long Beach regulations and service pages.

Levi Design Build

Long Beach • Los Angeles County
(818) 703-0232 leviconstruction.com

Local proof: Levi lists Long Beach in its ADU service-area roster.

Are you an ADU builder serving Long Beach?

Get Featured or Verified to add photos and priority placement.

Get Featured →

More California markets

Compare nearby city guides before you pick a builder.

If your project is near a city border or you want a wider shortlist, use the other market pages below or head back to the homepage hub.

Open the California market hub

Long Beach ADU Guide

Long Beach homeowners usually have the same four core ADU paths: convert existing space, build a detached backyard unit, add an attached unit, or create a JADU inside the main house. The best path depends on your lot, utilities, budget, and how quickly you want to get through permitting.

Garage conversion ADU

Garage conversion ADU

Detached backyard ADU

Detached backyard ADU

Attached ADU

Attached ADU

JADU (inside main home)

JADU (inside main home)

ADU Rules

+

Use these as your first underwriting assumptions, then confirm them with Long Beach Planning and Building before final design.

TopicLong Beach baseline
Governing rulesLong Beach says it currently applies state ADU law directly while its local ordinance is being updated.
How many units can I add?A typical single-family lot usually starts with the standard California pattern of 1 ADU plus 1 JADU when the site qualifies.
JADU sizeJADUs are capped at 500 sqft and must be created inside the existing single-family home, attached garage, or attached addition.
Owner occupancyLong Beach states owner occupancy in either the JADU or the main home is required for a JADU.
Setbacks and heightThe city points applicants to the HCD ADU Handbook and local planning review for setbacks, height limits, and parking standards while the ordinance update is in progress.
Historic / coastal reviewHistoric districts need a Certificate of Appropriateness, and Coastal Zone properties need an administrative Local Coastal Development Permit before building permit submittal.
Permit intakeLong Beach requires ADU plans to be submitted in person at the Permit Center with a digital PDF on a USB drive. Online ADU submissions are not currently available.
Pre-approved plansThe city has a Pre-Approved ADU Program for new-construction ADUs, not conversions of existing space.
Short-term rentalsLong Beach states ADUs and JADUs are not qualified dwelling units for STR registration, so underwrite these units as long-term rentals.

Cost Breakdown

+

Long Beach detached ADUs can move quickly on timeline when the lot is straightforward, but coastal issues, older utility systems, or structural conversion work can still push costs up.

Project typeTypical all-in cost range (Long Beach)
Garage conversion ADU$115K – $235K
JADU (inside main home)$85K – $155K
Attached ADU$190K – $335K
Detached ADU (new build)$230K – $420K+

Biggest budget movers in Long Beach

  • Coastal Zone review or added site constraints
  • Sewer, electrical, and panel work on older housing stock
  • Foundation upgrades on conversions
  • Parking and access redesign on tighter urban lots
  • Flood, liquefaction, or other site-specific engineering
  • Finish level and sound/privacy upgrades

Permit Process

+

Typical flow

  • Confirm eligibility with Planning – Long Beach asks owners to verify ADU eligibility before building permit work starts
  • Screen for overlays – coastal and historic status matter early
  • Choose the path – custom plans, garage conversion, or a city pre-approved detached design
  • Submit in person – bring the permit application and full digital PDF plan set on a USB drive
  • Concurrent plan review – the city says a planner and engineer review the plans together
  • Respond to corrections and pull permit
  • Build and inspect through final

Realistic timing

  • Feasibility + concept: ~2–6 weeks
  • Design + engineering: ~1–3 months
  • Plan review: Long Beach says typical review time is about 4 to 6 weeks once fees are paid
  • Construction: ~4–9 months
  • Total: often ~5–14 months

Long Beach-specific advantages

  • The city advertises one of the strongest ADU production rates in California
  • Plan review is concurrent, not purely sequential
  • Pre-approved detached plans can save time on the right lot

Rental Income

+

Long Beach ADUs tend to work best as long-term rentals for small households, family, or coastal-adjacent renters priced out of larger units. The short-term rental path is the wrong assumption here because the city excludes ADUs from STR eligibility.

What can an ADU rent for in Long Beach?

Unit typeBroad monthly range
Studio / small JADU$2,000 – $2,500
1 BR ADU$2,350 – $3,100
2 BR ADU$3,000 – $3,900+

Rental strategy notes

  • Underwrite for 30-plus-day use, not Airbnb-style occupancy
  • Detached units with parking and privacy usually command the strongest premium
  • Coastal and walkable neighborhoods can outperform the range above

FAQs

+

Does Long Beach use its own ADU ordinance right now?

Not fully. Long Beach says it is currently applying state ADU law directly while a local ordinance update is still in progress.

Can I submit ADU plans online in Long Beach?

No. Long Beach says plans and permit applications must be submitted in person at the Permit Center, along with a digital PDF set on a USB drive.

How long does plan review take in Long Beach?

The city says typical review time is about 4 to 6 weeks once the fees are paid, assuming the project is straightforward and corrections are limited.

Are there special rules in the Coastal Zone or historic districts?

Yes. Coastal properties need an administrative Local Coastal Development Permit, and historic properties require the relevant historic approval before standard building permit review can move forward.

Can I use a pre-approved Long Beach ADU plan?

Yes, but the city's pre-approved program is aimed at new-construction ADUs, not conversions of existing space.

Can I rent a Long Beach ADU short-term?

No. Long Beach states that ADUs and JADUs are not qualified dwelling units for STR registration.

How much does a Long Beach ADU usually cost?

Many Long Beach homeowners underwrite roughly $115,000 to $235,000 for conversions and $230,000 to $420,000 or more for detached new construction.