ADU Builders in
Pasadena, CA

Compare 3 builders with sourced Pasadena service evidence and CSLB records checked August 7, 2026, plus permit, utility, and design paths

Need help choosing a builder?

We manually compare your city, ADU type, project stage, and budget with builders' published service areas and ADU focus. We then follow up by email.

Free • No obligation • Sharing requires consent

Request a builder shortlist

Consent is required before details may be shared · Or browse builders below ↓

Quick Stats

Max ADU size
site-dependent
Height
site-dependent
Setbacks
4 ft typical
Permit Time
Varies by path
Build Cost
Compare 3 bids
Monthly Rent
Check local leases
ROI
After final bids

Directory

Compare 3 ADU builders with sourced evidence that they serve Pasadena. Their CSLB records were checked current and active on August 7, 2026, but status can change. Inclusion is not an endorsement; confirm current CSLB status before signing.

3 Builders

Create Construction

Serves Pasadena • Burbank office

Source-backed details

Pasadena service: Create Construction publishes a Pasadena-specific ADU service page. Checked Aug 7, 2026.

CSLB #1070134: Current and active · B – General Building · Checked Aug 7, 2026

License entity: Create Construction Inc

Otto ADU

Serves Pasadena • Los Angeles office
(323) 210-4670 ottoadu.com

Source-backed details

Pasadena service: Otto publishes a completed Pasadena ADU project and names Pasadena in its permit workflow. Checked Aug 7, 2026.

CSLB #1081287: Current and active · B – General Building · Checked Aug 7, 2026

License entity: Homestead Build LLC dba Otto ADU

Adar Builders

Serves Pasadena • Winnetka office
(818) 918-3556 adarbuilders.com

Source-backed details

Pasadena service: Adar's Pasadena service page includes accessory dwelling units among its local services. Checked Aug 7, 2026.

CSLB #1051859: Current and active · B – General Building · Checked Aug 7, 2026

License entity: Adar Builders Inc

Are you an ADU builder serving Pasadena?

Paid plans add clearly labeled placement and expanded listing details. Verified badges require document review.

Get Featured →

Pasadena ADU Guide

Pasadena homeowners usually have the same four core ADU paths: convert existing space, build a detached backyard unit, add an attached unit, or create a JADU inside the main house. The best path depends on your lot, utilities, budget, and how quickly you want to get through permitting.

Garage conversion ADU

Garage conversion ADU

Detached backyard ADU

Detached backyard ADU

Attached ADU

Attached ADU

JADU (inside main home)

JADU (inside main home)

ADU Rules

+

Start with Pasadena's current ADU program page and confirm the exact requirements with Planning, Building, and Pasadena Water & Power.

Choose the design path before drawing the site plan

Most Pasadena properties currently need a project-specific design. The city's January 2026 standard-plan update says the prior plans expired for general use and are limited to qualifying Eaton Fire red-tagged properties while replacements are prepared.

Even an eligible standard plan is not permit-ready. Pasadena still requires a site-specific package that can include structures, setbacks, access, trees, electric panels, water heating, sewer routing, and drainage. The city's standard-plan submission steps explain those checks.

Historic status can also change the layout. Pasadena's current ADU rules say new attached and detached ADUs in historic districts must not be visible from the public right-of-way. Confirm the property's designation before fixing the building location or elevations.

Homeowner questionCurrent Pasadena check
Which project type fits?Compare conversion, attached, detached, and JADU paths against the legal structures and property constraints.
What setbacks apply?Four-foot side and rear setbacks are a common ADU baseline, but existing conditions and project-specific code still matter.
Is parking required?Pasadena publishes parking exemptions, including qualifying transit and conversion situations. Confirm the property's exact path.
Does historic status matter?Yes. Historic districts and individually designated properties follow different conversion, visibility, and new-construction rules.
Are smaller ADUs exempt from an impact fee?Pasadena says ADUs of 900 sqft or smaller are exempt from the Residential Impact Fee. Other project costs can still apply.
Is early city help available?Pasadena offers a complimentary virtual consultation before formal review.
Are standard plans generally available?Not currently. The prior plans expired for general use on January 1, 2026 and remain limited to qualifying Eaton Fire red-tagged properties until replacements arrive.

Cost Breakdown

+

Pasadena does not publish one construction price that fits every ADU. Use the same scope for at least three itemized bids.

Resolve electric service before the design is fixed

If the ADU may need a new meter, secondary service, or panel upgrade, start with Pasadena Water and Power's Electric Service Planning process. PWP begins with a meter spot and service review, then identifies the approved location and any required upgrade.

PWP's ADU electric-service requirements allow a requested separate ADU meter, require meters at the same panel or another PWP-approved location, and keep utility easements clear. Ask each builder to identify who owns this coordination and whether the bid includes the resulting service work.

Cost lineWhat to confirm
Property and conceptZoning, legal structures, survey needs, historic status, hillside conditions, access, and easements.
Design and engineeringArchitectural, structural, energy, civil, drainage, soils, and other project documents.
City review and permitsPlanning, Building, corrections, permit fees, and any historic or design review.
UtilitiesElectrical capacity, meters, sewer and water routing, trenching, and Pasadena Water & Power requirements.
Site and structureDemolition, foundation, grading, drainage, retaining walls, and conversion reinforcement.
Construction and finishesLabor, materials, fixtures, appliances, allowances, and owner-supplied items.
Exclusions and contingencyUnknown conditions, change orders, price-expiration dates, and excluded work.

Permit Process

+

A practical sequence

  • Screen the property. Check zoning, legal structures, historic status, hillside conditions, utilities, access, and easements.
  • Choose the design path. Use a project-specific design unless the property qualifies for Pasadena's current Eaton Fire standard-plan exception.
  • Check electric service early. Ask PWP whether the concept needs a meter spot, panel upgrade, new service, or easement review.
  • Use the city consultation. Pasadena offers a complimentary virtual ADU consultation before formal plan review.
  • Prepare the site package. Show the site conditions, access, utilities, drainage, and any supporting studies the city requires.
  • Submit and track online. Pasadena's Permit Center Online accepts ADU plans, fees, status checks, resubmittals, and inspection scheduling.
  • Respond, permit, and build. Resolve planning, building, utility, and historic-review comments before permits, inspections, and final approval.

What the published timing means

Pasadena's current standard-plan page gives eligible standard-plan projects an approximate three-to-four-week plan-check estimate and an approximate two-week resubmittal estimate. Do not apply those numbers to a custom design or an end-to-end project. Ask the city and PWP for the current path-specific expectations after the property and utility screen.

Rental Income

+

Use current long-term lease evidence

Check current Pasadena leases for comparable units by size, bedrooms, privacy, parking, utilities, outdoor space, and condition. Then account for vacancy, repairs, insurance changes, owner-paid utilities, management, and financing before estimating a return.

Confirm the intended rental term and any property-specific restrictions before including income in the project decision.

FAQs

+

Does Pasadena accept online ADU applications?

Yes. Pasadena directs applicants to Permit Center Online for applications and plan uploads.

Does Pasadena offer an ADU consultation?

Yes. The city offers a complimentary virtual consultation before formal review.

How long does Pasadena's standard-plan review take?

For currently eligible projects, Pasadena's standard-plan page says plan-check review takes approximately three to four weeks and a resubmittal approximately two weeks. Those estimates do not cover a custom-plan review or the full project.

Can any Pasadena property use the city's standard ADU plans?

Not currently. Pasadena says the prior plans expired for general use on January 1, 2026 and remain limited to qualifying Eaton Fire red-tagged properties until new citywide plans arrive.

How should I budget for a Pasadena ADU?

Compare at least three itemized bids with the same scope. Resolve utilities, historic status, grading, permits, and exclusions before relying on a total.

When should I involve Pasadena Water and Power?

Before finalizing the design if the ADU may need a new electric meter, secondary service, or panel upgrade. PWP's current service process starts with a meter spot and utility review.

How are the listed Pasadena builders selected?

The directory uses public evidence that a company serves Pasadena. Inclusion is not an endorsement. Verify the builder's current California license, insurance, references, scope, and availability.

Pasadena official sources

+

Next step

Compare Pasadena builders against the same project brief.

We manually compare your city, ADU type, project stage, and budget with builders' published service areas and ADU focus. We then follow up by email. If you consent, we may share your brief with builders that appear relevant. A request does not guarantee a builder match or response.

Request a Pasadena builder shortlist