ADU Builders in
Sacramento, CA

Compare 3 builders with sourced Sacramento service evidence and CSLB records checked August 8, 2026, plus city plan, permit, and utility guidance

Need help choosing a builder?

We manually compare your city, ADU type, project stage, and budget with builders' published service areas and ADU focus. We then follow up by email.

Free • No obligation • Sharing requires consent

Request a builder shortlist

Consent is required before details may be shared · Or browse builders below ↓

Quick Stats

Max ADU size
Up to 1,200 sq ft
Height
18 ft or zoning limit
Setbacks
3–4 ft by path
Permit Time
1.5–2 months review
Build Cost
Compare 3 bids
Monthly Rent
Use current leases
ROI
After full budget

Directory

Compare 3 ADU builders with sourced evidence that they serve Sacramento. Their CSLB records were checked current and active on August 8, 2026, but status can change. Inclusion is not an endorsement; confirm current CSLB status before signing.

3 Builders

Redwood ADU

Sacramento office
(916) 905-4710 redwoodadu.com

Source-backed details

Sacramento service: Redwood ADU describes itself as a Sacramento-local design-build contractor serving the greater Sacramento area. Checked Aug 8, 2026.

CSLB #1098046: Current and active · B – General Building · Checked Aug 8, 2026

License entity: Redwood ADU LLC

C&V Contractors

Serves greater Sacramento
(916) 366-3700 cvcontractors.com

Source-backed details

Sacramento service: C&V Contractors publishes a Sacramento ADU project and states that it serves the greater Sacramento area. Checked Aug 8, 2026.

CSLB #620803: Current and active · B – General Building · Checked Aug 8, 2026

License entity: C & V Contractors

A1 Building Contractors

Serves Sacramento • Roseville office

Source-backed details

Sacramento service: A1 Building Contractors publishes a Sacramento-specific ADU construction page. Checked Aug 8, 2026.

CSLB #1094366: Current and active · B – General Building · Checked Aug 8, 2026

License entity: Andrew Lowell dba A1 Building Contractor

Are you an ADU builder serving Sacramento?

Paid plans add clearly labeled placement and expanded listing details. Verified badges require document review.

Get Featured →

Sacramento ADU Guide

Sacramento homeowners usually have the same four core ADU paths: convert existing space, build a detached backyard unit, add an attached unit, or create a JADU inside the main house. The best path depends on your lot, utilities, budget, and how quickly you want to get through permitting.

Detached ADU

Detached ADU

Attached ADU

Attached ADU

Conversion ADU

Conversion ADU

Junior ADU

Junior ADU

ADU Rules

+

Start with Sacramento's ADU Resource Center and its rules comparison. The city explains that applicants may choose the local ordinance or state standards, but the two paths should not be mixed.

Homeowner questionCurrent Sacramento check
How large can a detached ADU be?The local ordinance allows detached ADU floor area up to 1,200 square feet. The state-standard path includes an 800-square-foot detached route. Confirm the selected path before design.
What height applies?Sacramento's local path uses the property's zoning height limit. The state-standard detached route starts at 18 feet, with a possible additional allowance tied to roof pitch.
What setbacks apply?The local path can use a 3-foot interior side and rear setback in qualifying locations. The state-standard detached route uses 4-foot side and rear setbacks.
Are historic properties different?Yes. Sacramento publishes separate objective design standards for ADUs on historic properties. Confirm the parcel's status before choosing a plan.
Can I use a city plan?Sacramento offers free shelf-ready plans, but each project still needs a site plan and property-specific review.

Choose the rule path before the floor plan

Sacramento's local ordinance can support a larger detached unit or a different combination of units than the state-standard route. The state path can protect a smaller detached unit under statewide standards. Ask Planning to confirm the viable path for the property in writing before the designer fixes the footprint.

Use a shelf-ready plan only when the site fits

The city's shelf-ready plan library includes an all-electric 367-square-foot studio, a 559-square-foot one-bedroom unit, and a 747-square-foot two-bedroom unit. Sacramento says the building plans may only be mirrored, not otherwise modified.

A shelf-ready plan does not remove site work. The city still requires a site plan showing the lot, existing buildings, the proposed ADU, utilities, trees, easements, access, setbacks, and other property conditions. If the plan does not fit those conditions, use a project-specific design.

Cost Breakdown

+

Sacramento does not publish one construction price that fits every property. Use the same scope for at least three itemized bids, and do not treat a builder's advertised range as a city-backed estimate.

Scope lineWhat to compare
Feasibility and designSurvey, zoning path, shelf-ready or custom plan, architecture, structural work, energy documents, and revisions.
City and agency costsPlan review, building permit, address assignment, tree review, utility review, and any property-specific fees.
Site and utilitiesAccess, demolition, grading, drainage, sewer, water, electrical service, trenching, and meter work.
ConstructionFoundation, framing, roof, windows, exterior finish, insulation, mechanical, electrical, plumbing, and inspections.
Interior scopeCabinets, counters, flooring, tile, fixtures, appliances, lighting, paint, and accessibility choices.
Risk allowancePlan-check corrections, utility upgrades, concealed conditions, lead times, and written change-order rules.
Sacramento's current building handout says an ADU under 750 square feet is exempt from city impact fees. Other plan, permit, utility, school, design, and construction costs may still apply, so confirm the current fee schedule for the exact address.

Give every builder the same written property facts, chosen rule path, plan type, utility assumptions, finish level, and exclusions. A lower total is not a better comparison when it leaves out work another bid includes.

Permit Process

+

Sacramento's application guidance says a building permit is required. The city also offers an optional zoning review before the complete building submission.

  • Confirm jurisdiction and parcel facts. Make sure the property is inside the City of Sacramento, then check zoning, lot conditions, easements, trees, utilities, and historic status.
  • Choose local or state standards. Use Sacramento's comparison with Planning before the unit count, size, height, and setbacks are fixed.
  • Choose shelf-ready or custom design. Use a city plan only if its fixed building layout and the site-specific requirements fit the property.
  • Resolve site and utility questions. Show utility routes, service capacity, tree impacts, fire access, drainage, and any separate agency work.
  • Prepare the application. Sacramento asks for a complete plan set, site plan, required forms, and supporting calculations for building review.
  • Submit and answer comments. Track plan-check comments and keep correction responsibility clear in the designer and builder scopes.
  • Issue permits and build. Complete required inspections and final approvals before occupancy.

What the published review estimates cover

Sacramento describes optional zoning review as approximately one to three weeks. The same city page describes building plan review as approximately one and a half to two months, with review cycles of 20, 15, and 5 business days.

Those are review-stage estimates, not an end-to-end project promise. Applicant correction time, utility coordination, address assignment, tree or historic review, permit issuance, construction, inspections, and final approval sit outside or around those windows.

Sacramento-specific checks

  • New address: Sacramento says every ADU needs a separate address, which can be requested after application intake.
  • Trees: A project affecting protected trees may need an arborist report and a tree permit.
  • Historic properties: Use Sacramento's objective ADU design standards when the property is a historic resource.
  • Utilities: Confirm water, sewer, electrical capacity, service routing, and agency responsibility before the site plan is treated as final.
  • Shelf-ready plans: The building sheets are reusable, but the property still needs a complete site-specific package.

Rental Income

+

Do not base the project on a statewide rent average or a builder's example. Use current Sacramento long-term leases for units that match the proposed bedrooms, size, privacy, parking, utilities, outdoor space, and condition.

For a conservative model:

  • Use the lower end of current comparable long-term leases.
  • Multiply monthly rent by 12 for annual gross rent.
  • Subtract vacancy, maintenance, insurance, utilities paid by the owner, management, and reserves.
  • Compare the remaining annual amount with the full project budget, including financing and contingency.
Rental rules differ between Sacramento's local and state-standard paths. Confirm the selected path and the current short-term rental rules before treating any rental strategy as viable.

FAQs

+

Which Sacramento ADU rules should I use?

Sacramento lets applicants choose between the city's local ordinance and California's state ADU standards. The allowed unit count, size, height, setbacks, and rental rules can differ, so choose the path with the city before design.

Does Sacramento offer free ADU plans?

Yes. Sacramento publishes free shelf-ready plans for a 367-square-foot studio, a 559-square-foot one-bedroom unit, and a 747-square-foot two-bedroom unit. Each property still needs a site-specific plan and permit review.

Can I modify Sacramento's shelf-ready plans?

Sacramento says the shelf-ready building plans cannot be modified except by mirroring the layout. The site plan still needs to show property lines, structures, utilities, trees, easements, setbacks, and other site conditions.

How long does Sacramento ADU plan review take?

Sacramento describes optional zoning review as roughly one to three weeks and building plan review as roughly one and a half to two months. Those estimates exclude applicant correction time, utility work, permit issuance, construction, and inspections.

What should I check before submitting Sacramento ADU plans?

Confirm the planning path, site fit, utilities, tree impacts, address assignment, and any historic-property requirements before treating the design as final.

How should I budget for a Sacramento ADU?

Give at least three builders the same property facts and scope. Compare design, engineering, permits, utilities, site work, construction, finishes, exclusions, allowances, and contingency before relying on a total.

How are the listed Sacramento builders selected?

The directory uses public evidence that a company serves Sacramento and a dated CSLB license check. Inclusion is not an endorsement; homeowners should verify current licenses, insurance, references, scope, and availability.

Sacramento official sources

+

Next step

Compare Sacramento builders against the same project brief.

We manually compare your city, ADU type, project stage, and budget with builders' published service areas and ADU focus. We then follow up by email. If you consent, we may share your brief with builders that appear relevant. A request does not guarantee a builder match or response.

Request a Sacramento builder shortlist